Introduction to AVIXA Certified Technology Specialist (CTS) Exam

The AVIXA CTS Exam is challenging and thorough preparation is essential for success. This exam study guide is designed to help you prepare for the CTS certification exam. It contains a detailed list of the topics covered on the Professional exam, as well as a detailed list of preparation resources. This study guide for the AVIXA Certified Technology Specialist will help guide you through the study process for your certification.

CTS pdf, CTS questions, CTS exam guide, CTS practice test, CTS books, CTS Syllabus, CTS

CTS AVIXA Certified Technology Specialist Exam Summary

Exam Name: AVIXA Certified Technology Specialist

Exam Code: CTS

Member Exam Price: $375 (USD)

Non-Member Exam Price: $475 (USD)

Duration: 150 mins

Number of Questions: 110

Passing Score: 350 / 500

Books / Training: Candidate Handbook

Schedule Exam: Pearson VUE

Sample Questions: AVIXA CTS Sample Questions

Recommended Practice: AVIXA CTS Certification Practice Exam

Exam Syllabus: CTS AVIXA Certified Technology Specialist (CTS)

1. Duty A: Creating AV Solutions (47%)

● Task 1: Gather Customer Information (10%)

● Task 2: Conduct Initial Site Survey (9%)

● Task 3: Evaluate Site Environment (acoustics, lighting, seating, finishing, etc.) (9%)

● Task 4: Develop an AV Project Scope (9%)

● Task 5: Design AV Solutions (10%)

2. Domain 2: Implementing AV Solutions (27%)

● Task 1: Integrate AV Solutions (10%)

● Task 2: Operate AV Solutions (9%)

● Task 3: Manage AV Projects (8%)


3. Domain 3: Servicing AV Solutions (26%)

● Task 1: Maintain AV Operations (8%)

● Task 2: Conduct Maintenance Activities (8%)

● Task 3: Troubleshoot and Repair AV Solutions (10%)

AVIXA CTS Certification Sample Questions and Answers


To make you familiar with AVIXA Certified Technology Specialist (CTS) certification exam structure, we have prepared this sample question set. We suggest you to try our Sample Questions for CTS Certification to test your understanding of AVIXA CTS process with the real AVIXA certification exam environment.


CTS AVIXA Certified Technology Specialist Sample Questions:-


01. The brightness controls on a display adjusts which level?

a) Black Level

b) Chroma Level

c) Hue

d) White Level


02. When selecting a DC power supply that has to run a long distance, what must be considered?

a) RF interference

b) voltage drop

c) cable capacitance

d) inductance


03. Which system is used to show colors from a video display?

a) Subtractive color system

b) Additive color system

c) Plus/minus color system

d) Recover color system


04. A client requires a front projection system. What drawings should be requested from the client to select the appropriate lens?

a) reflected ceiling plans and elevations

b) building section and millwork details

c) floor plans and wall details

d) structural and electrical plans


05. There is concern about the noise level in an AV rack room. What weight setting on the SPL meter should be used to demonstrate that the noise level doesn't require hearing protection at all times?

a) A Weighted

b) C Weighted

c) D Weighted

d) Z Weighted


06. What should be done first if a control system’s touch screen is reported as locked, frozen, or otherwise not functioning?

a) Remove the device, switch it out and return it to the manufacturer for diagnostic checks

b) Use a voltage meter to check for continuity, remove mother board and switch it out

c) Reroute all systems to the nearest functioning system

d) Check all connectors; confirm the screen is not in power saver mode


07. Projectors may use different lamp technologies for different reasons. For long life without changing the light source, which technology is preferred?

a) Halogen lamp

b) Fluorescent lamp

c) LED lamp

d) Arc lamp


08. When working with a client to design an AV solution for a new conference center, the client requests a detailed budget for the equipment and installation.

What phase is the project in?

a) Design phase

b) Program phase

c) Bidding phase

d) Installation phase


09. Which phase comes first in a project?

a) Commissioning and Training Phase

b) The Design Phase

c) The Construction Phase

d) The Program Phase


10. After presenting a proposal to a client, confirming that all objections are answered and that the final buying decision will be made at an internal meeting, what is the next step?

a) Call once, a month later

b) Include the client in the corporate e-blasts

c) Communicate regularly, until a decision is made

d) Wait for the client to email the order


Answers:-


Answer 1:- a

Answer 2:- b

Answer 3:- b

Answer 4:- a

Answer 5:- a

Answer 6:- d

Answer 7:- c

Answer 8:- a

Answer 9:- d

Answer 10:- c